Home/Siding/Lewes

Lewes, Delaware

Siding in Lewes, DE

In the Lewes Historic District, new siding changes the face of your house, and the city reviews exactly that. Outside the district a Lewes siding job is simpler, and knowing which one you have is the first step.

Does my Lewes siding project need historic review?

Only if the house is in the Historic District, and that is easy to check. District properties carry an "(H)" at the end of their zoning designation (R-4(H), for example), and the city publishes both a zoning map and a historic map. The Building Official at (302) 645-7777 can confirm any address.

If it is in the district, the Historic Preservation Architectural Review Commission (HPARC) must approve any work that changes an exterior facade visible from the street. Of all the exterior trades, siding changes the facade most completely. The material, the profile (clapboard reveal, shingle pattern, trim widths) and the color are all part of what the commission looks at.

Plenty of homes with a Lewes address are nowhere near the old town. Houses out toward Route 1 and Route 9 are usually in unincorporated Sussex County, permitted in Georgetown at (302) 855-7720, and have no design review at all.

How the HPARC calendar shapes the job

HPARC meets once a month, on the first Thursday at 6 pm at City Hall, 114 E. Third Street. Applications have to be in at least ten business days before that meeting. Miss the cutoff by a day and the review moves a full month.

So a Historic District re-siding runs in a fixed order: we agree the material and color with you, prepare the submission, make the deadline, get the approval, pull the permit, then order material. Starting the conversation a couple of months ahead of when you want the crew on site is the realistic way to plan it. If a wall is actively letting water in, a repair that closes it up while the review runs is usually the right first step, and we will say so.

City of Lewes Building Department: (302) 645-7777, City Hall, 114 E. Third Street. We prepare the HPARC submission and track the deadline so a missed date is never why your project waits.

What is behind the siding on an old Lewes house?

Often more than one generation of cladding. Old-town houses frequently have original wood clapboard with later siding installed right over it, sometimes twice. That matters for three reasons:

  • Hidden condition. What the sheathing and framing look like is unknown until the layers come off. We talk about the chance of sheathing repairs before the job, not after the tear-off.
  • Window and door trim. Every added layer thickens the wall and buries the original trim. Getting the new siding, the trim and the flashing to meet properly at old windows is the detailed part of the job.
  • The barrier that was never there. Many older walls were built without any water-resistive barrier. Re-siding is the one chance to add one and flash it correctly at every opening.

Is Lewes siding exposed to salt like the ocean towns?

The salt is the same; the wind is usually gentler. Lewes faces the Delaware Bay and sits partly behind Cape Henlopen, so it rarely takes the full open-ocean blow that Dewey does. But airborne salt corrodes fasteners and metal trim whether it came off the bay or the ocean. Homes along the canal, out toward Roosevelt Inlet, or on open ground north of town see much more weather than a house on a sheltered old-town street, so we judge exposure wall by wall rather than by the town name.

Materials and the full process: see the main siding page.

More in Lewes and nearby

Questions

Lewes siding FAQ

Does new siding need HPARC approval in Lewes?

In the Historic District, yes. The Historic Preservation Architectural Review Commission must approve any work that changes an exterior facade visible from the public right of way, and new siding changes the facade directly, so its material, profile and color are reviewed. Outside the district there is no design review.

How do I know if my Lewes house is in the Historic District?

District properties have an (H) suffix on their zoning, such as R-4(H). The City of Lewes publishes a zoning map and a historic map, and the Building Official at (302) 645-7777 can confirm an address. Many homes with a Lewes mailing address are in unincorporated Sussex County instead.

How long does Historic District review add to a siding project?

HPARC meets on the first Thursday of each month at 6 pm, and applications are due at least ten business days before the meeting. Missing that deadline pushes the review a month, so Historic District siding should be planned a couple of months ahead of the work.

What will you find under the siding on an old Lewes house?

Frequently the original wood clapboard with newer siding layered over it, sometimes more than once, and often no water-resistive barrier at all. The sheathing condition is unknown until the layers come off, which is why we discuss possible sheathing repairs before starting.

Who permits siding outside the Lewes city limits?

Sussex County, through its Building Permit Office in Georgetown at (302) 855-7720. The county lists siding among the work requiring a building permit, and there is no historic review outside the city.

Get started

Siding work in Lewes

One visit covers every wall, the permit question and a realistic schedule. Call, text or send the form.

Request a Free Estimate Call (302) 291-3896 Text us
Call Free Estimate